Planning and site assessment
Landform, bore records and site observations help us establish where groundwater occurs and whether it could affect an excavation, wetland or proposed land use.
Hydro Geo Environmental Consulting
Planning a development near a wetland, excavating below the water table or reviewing a permit condition? Talk to a hydrogeologist about the groundwater evidence your project needs.
Send the wording of council’s request, a site plan and a brief description of the works. If you already have bore logs or groundwater levels, mention them too. HGEC can identify what the existing information answers and what fieldwork the report will need.
For a mapped wetland, see how the Serpentine assessment documented where water collected and how long it stayed.
Discuss a council requestLandform, bore records and site observations help us establish where groundwater occurs and whether it could affect an excavation, wetland or proposed land use.
We design monitoring networks, sample groundwater and interpret water levels and chemistry. The findings establish baseline conditions or help explain a change at an operating site.
Where proposed works could change groundwater levels or flows, we assess the likely effects and identify practical design or monitoring options.
Victoria’s native vegetation rules treat an area on the Current Wetlands map as a patch of native vegetation when assessing proposed clearing. Wetland plants can remain dormant through years of drought. A dry paddock at inspection, or a history of cropping or grazing, does not by itself establish grounds for exclusion (DEECA 2025a, 2025b).
Check the mapped boundary against your proposed works and ask your local council whether you need a planning permit. Clause 52.17 generally applies to native vegetation removal. Clause 52.16 covers land subject to a native vegetation precinct plan (DEECA 2025a).
Check your property on Victoria’s Native Vegetation Regulation Map
Discuss a mapped wetlandOne reason to request exclusion is that the land cannot support wetland-associated native vegetation. For this assessment, the Department of Energy, Environment and Climate Action (DEECA) asks whether the area is physically unable to hold surface water or stay waterlogged for more than one month. If the duration is uncertain, a suitably qualified professional must assess it (DEECA 2025b, table 8).
HGEC examines ground levels, soils, drainage and groundwater records alongside dated aerial images and site photographs. Together these can show where water collects and how long it persists after rain or flooding.
For an exclusion on these hydrological grounds, obtain written agreement from the Secretary to DEECA before lodging the planning application. Include the mapped area and supporting evidence in the request. Any native vegetation still present and proposed for removal must be assessed unless an exemption applies (DEECA 2025a, 2025b).
DEECA (2025a), Guidelines for the removal, destruction or lopping of native vegetation, version 1.1, sections 2.3 and 3.2.1.
DEECA (2025b), Native vegetation removal regulations – Detailed pathway application guidance, table 8, “Mapped wetland exclusion policy”.
Client Farm landholder
Flood imagery showed three mapped depressions draining within three weeks. DEECA agreed to exclude them from the assessment. Our Victorian mapped wetland guide explains the evidence relevant to the DEECA guideline.
Serpentine projectClient CQG Consulting
At Gracemere, the question was whether the pit had reached the water table. Bore records and site elevations allowed us to compare the pit floor with the water table.
Gracemere project